The Innofibre Hub benefits from a new 30,000 square foot building, designed to support innovation in the field of cellulose products.
The new space has been designed to house applied research laboratories, providing SMEs, large corporations and other organizations with state-of-the-art facilities for developing compostable cellulosic packaging processes from wood residues in the construction sector.
By providing an environment conducive to research and development, this building not only enhances Innofibre’s service offering, but also promotes the training of the next generation in a rapidly evolving sector.
Artelia was selected to oversee several critical aspects of the construction. Our services include assistance with the design and updating of plans, preliminary inspection of installations, and supervision of building envelope work. In addition, our soil and materials engineering experts were commissioned to provide work approval, on-site quality control, and laboratory testing and analysis, ensuring the success of this innovative project.
Driven by our values of technical excellence, proximity to clients and entrepreneurial spirit, we are more than ever determined to be a company that is useful to the world and to people, and that contributes to have a positive impact on the environment and society.
© 2025 Artelia Canada all rights reserved.
In order to provide the best experiences, we use technologies such as cookies to store and/or access device information. These technologies enable us to process data such as browsing behavior or unique identifiers on this site. To find out more about the processing and storage of data collected, please consult our privacy policy >
You may freely give, refuse or withdraw your consent at any time by modifying _preference panel / _cookie settings. Refusal or withdrawal of consent may alter certain features and functions.