Modernization of the Mont-Tremblant drinking water production plant

Artelia was commissioned to help the city update its drinking water treatment system.
Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Geotechnical investigation campaign for REM

Geophysical surveys and laboratory tests for foundation design and groundwater monitoring were carried out.
Mapping landslide-prone areas for the Ministère des Transports et de la Mobilité durable

The geomatics service has produced a geospatial database containing information on areas with particular slopes.
Mapping associated with the expansion of Hydro-Québec’s La Prairie substation

Artelia’s geomatics service was commissioned to produce precise, detailed cartographic products.
Conversion of parking lots into eco-responsible spaces

The aim of this project was to transform these spaces into eco-responsible parking lots by integrating stormwater management solutions.
Pierre-Dansereau Park development

The layout is distinguished by its multi-functionality, allowing innovative water management thanks to its rain garden and retention basin.
Embankment stabilization in Notre-Dame-de-l’Ile-Perrot

This complex project required cutting-edge technical solutions, combining safety, sustainability and respect for environmental issues.
Environmental impact study for the new Île d’Orléans bridge

Our expertise enabled us to propose appropriate mitigation measures to minimize the project’s impact on the environment.
Manoir Hovey expansion project

Our experts were therefore commissioned to support Le Manoir through both phases of expansion.