Water management at the Mont-Right mine

This project was carried out under particularly difficult conditions, requiring great flexibility and rigorous monitoring.
Red water treatment plant and pipe network, Pointe-Noire

We’re proud to be part of a more sustainable transition from mining to responsible resource use.
Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Geotechnical investigation campaign for REM

Geophysical surveys and laboratory tests for foundation design and groundwater monitoring were carried out.
Geological study of Manic-5 generating station

Artelia was commissioned to carry out a detailed analysis and propose recommendations tailored to the site’s unique geotechnical challenges.
Valoris waste sorting center

We developed optimal solutions for extracting recyclable and organic materials while respecting agreed deadlines and budgets.
Mapping landslide-prone areas for the Ministère des Transports et de la Mobilité durable

The geomatics service has produced a geospatial database containing information on areas with particular slopes.
Mapping associated with the expansion of Hydro-Québec’s La Prairie substation

Artelia’s geomatics service was commissioned to produce precise, detailed cartographic products.
Conversion of parking lots into eco-responsible spaces

The aim of this project was to transform these spaces into eco-responsible parking lots by integrating stormwater management solutions.
Pierre-Dansereau Park development

The layout is distinguished by its multi-functionality, allowing innovative water management thanks to its rain garden and retention basin.