Quebec City Biomethanization Center

We have been commissioned to ensure the quality control of materials, in particular aggregates, cement concrete and bituminous concrete.
Revitalization of downtown Granby

Our landscape architecture teams have put their expertise to work for the city, proposing innovative and sustainable developments.
Slope stabilization on the Ouimet-Gascon tributary in Terrebonne

This innovative approach, which preserved mature trees and avoided major excavations, is a groundbreaking first in Quebec.
Water management at the Mont-Right mine

This project was carried out under particularly difficult conditions, requiring great flexibility and rigorous monitoring.
Red water treatment plant and pipe network, Pointe-Noire

We’re proud to be part of a more sustainable transition from mining to responsible resource use.
Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Geotechnical investigation campaign for REM

Geophysical surveys and laboratory tests for foundation design and groundwater monitoring were carried out.
Geological study of Manic-5 generating station

Artelia was commissioned to carry out a detailed analysis and propose recommendations tailored to the site’s unique geotechnical challenges.
Valoris waste sorting center

We developed optimal solutions for extracting recyclable and organic materials while respecting agreed deadlines and budgets.
Mapping landslide-prone areas for the Ministère des Transports et de la Mobilité durable

The geomatics service has produced a geospatial database containing information on areas with particular slopes.