De Bromont boulevard redevelopment
Artelia was commissioned to design and build the redevelopment works, including a cycle path and retaining wall.
Route 138 extension – Lower North Shore
Artelia, in collaboration with its partners, was commissioned to design the section between La Tabatière and Tête-à-la-Baleine.
Simon-Valois Meeting zone
A meeting zone for pedestrians, cyclists and vehicles, in one and the same place, with no strict demarcation of spaces dedicated to each.
Remembrance Road redevelopment
Our multidisciplinary team was involved in every stage of design and implementation for this redevelopment.
Drone surveys for materials management at Carrière St-Dominique
We carried out photogrammetric surveys using a drone, generated precise 3D models, and calculated the quantities of materials.
Redevelopment of Galt Street West
A project to implement new developments designed to promote active modes of transport, increase pedestrian safety and improve traffic flow.
New charging stations for electric vehicles
Our ITS team was commissioned to develop concepts for the standardization of electric vehicle charging station layouts.
Traffic study in downtown Saint-Hyacinthe
Drones equipped with smart cameras offer superior image quality and enhanced visual support, facilitating more accurate data visualization.
Deconstruction of the Champlain Bridge
As the managing consortium, we ensured that the contractor put in place a rigorous system aiming to achieve high environmental standards.
3D scans and topographic surveys for the REM project
Thanks to our expertise and state-of-the-art equipment, we have established a network of precise survey markers and carried out 3D scans.