Always on the lookout for ways to optimize its performance, Domtar’s Windsor plant proposed an energy improvement project under Hydro-Québec’s program for the purchase of electricity from cogeneration plants. The project involved the installation of an 18 MW turbine-generator, making use of forest residues generated on site, as well as biomass from external sources, including residues from the region’s construction, renovation and demolition (CRD) sector. The aim was to increase energy production while promoting more sustainable resource management.
As part of this project, Artelia was commissioned to carry out a complete environmental impact study, in compliance with Quebec’s Environment Quality Act (EQA). The aim of the study was to assess the project’s effects and propose appropriate mitigation measures. Our services included environmental and social impact assessment, air emissions modeling, and preparation of the necessary applications for certificates of authorization. We also supported the project with public presentations and complementary studies, while providing a monitoring and follow-up plan for the work.
Driven by our values of technical excellence, proximity to clients and entrepreneurial spirit, we are more than ever determined to be a company that is useful to the world and to people, and that contributes to have a positive impact on the environment and society.
© 2025 Artelia Canada all rights reserved.
In order to provide the best experiences, we use technologies such as cookies to store and/or access device information. These technologies enable us to process data such as browsing behavior or unique identifiers on this site. To find out more about the processing and storage of data collected, please consult our privacy policy >
You may freely give, refuse or withdraw your consent at any time by modifying _preference panel / _cookie settings. Refusal or withdrawal of consent may alter certain features and functions.