Located on the Saint-François River near Weedon, the Weedon hydroelectric power station is a major component of the Hydro-Sherbrooke network, with an installed capacity of 3.7 MW. Made up of two powerhouses, a nine-gate spillway and several related structures, the complex ensures energy production and water level control. The modernization of this structure is part of an initiative to enhance its reliability and compliance with environmental and safety standards.
Artelia was commissioned to draw up the plans and specifications and supervise the refurbishment work on the water intakes and related dam components. The mandate also included support during the call for tenders, management of authorization applications to the relevant ministries, and ongoing site supervision throughout the two-year project. These interventions ensure the durability of this infrastructure, while optimizing its management and performance.
Driven by our values of technical excellence, proximity to clients and entrepreneurial spirit, we are more than ever determined to be a company that is useful to the world and to people, and that contributes to have a positive impact on the environment and society.
© 2025 Artelia Canada all rights reserved.
In order to provide the best experiences, we use technologies such as cookies to store and/or access device information. These technologies enable us to process data such as browsing behavior or unique identifiers on this site. To find out more about the processing and storage of data collected, please consult our privacy policy >
You may freely give, refuse or withdraw your consent at any time by modifying _preference panel / _cookie settings. Refusal or withdrawal of consent may alter certain features and functions.