Safety assessment of Foster Dam in Brome Lake
The purpose of the assessment was to verify the condition of the structure, its stability and functionality, and the conformity of its design and construction.
Geotechnical investigation campaign for REM
Geophysical surveys and laboratory tests for foundation design and groundwater monitoring were carried out.
Geological study of Manic-5 generating station
Artelia was commissioned to carry out a detailed analysis and propose recommendations tailored to the site’s unique geotechnical challenges.
Restoration of the Meder marsh
This Coaticook wetland was to be restored to preserve its biodiversity and contribute to global climate regulation.
Bromont’s new velodrome
This facility includes an Olympic-caliber cycling track, multi-sport gymnasiums and an athletics track.
New conveyor for SFFPN
A major project to increase goods transport capacity with the construction of a new 800-meter conveyor.
New Nemaska Lithium plant, Bécancour Industrial Park
Nemaska Lithium’s lithium conversion plant will play a central role in the development of the lithium-ion battery supply chain.
Universite de Sherbrooke’s new Institut quantique pavilion
With its design inspired by the dilution refrigerator essential to quantum research, this pavilion embodies an innovative approach.
Renovation of the Delta Hotel and the inter@tif event and convention center in Trois-Rivières
Commissioned for this ambitious project, our structural experts played a crucial role in the design and implementation of the work.
New District L’Adresse sur le Fleuve
Our geotechnicians, building specialists and materials control experts provided their multidisciplinary services for this project.