Wind power project in Bas-Saint-Laurent

The project has been established through a strong partnership with local municipalities and a First Nations community.
Rehabilitation of the Westbury hydroelectric complex

Our team was commissioned to carry out several essential rehabilitation works, including the stabilization of the left wing wall.
Renovation of the Sturgeon Falls hydroelectric power station

Our engineering procurement construction (EPC) model enabled us to intervene quickly and efficiently to complete this fast-track project.
Construction of the new 735 kV Micoua-Saguenay line

Artelia was commissioned by Hydro-Québec to carry out in-depth geotechnical studies on the foundations of more than a hundred pylons.
Battery energy storage system

Our teams provided electrical, structural and foundation engineering, SCADA and control configuration, and project management.
Quebec City Biomethanization Center

We have been commissioned to ensure the quality control of materials, in particular aggregates, cement concrete and bituminous concrete.
Rehabilitation of the Weedon power station – Hydro-Sherbrooke

This modernization is part of a process aimed at reinforcing its reliability and compliance with environmental and safety standards.
Geological study of Manic-5 generating station

Artelia was commissioned to carry out a detailed analysis and propose recommendations tailored to the site’s unique geotechnical challenges.
Optimizing the energy efficiency of the ÉTS pavilions

The aim of the project was to double cooling capacity by optimizing the facility’s flexibility and energy resilience.
Renovation of Université de Sherbrooke’s music school

This project was awarded first place in the ASHRAE Technology Awards, underlining our expertise in sustainable engineering.