14 November 2025

Our Gatineau team mobilized to repair a historic former railway bridge

News I
Our Gatineau team mobilized to repair a historic former railway bridge
Share
Artelia a donc été mandatée pour accompagner la Société de transport de l’Outaouais (STO) sur une période de trois ans.

The Société de transport de l’Outaouais (STO) has entrusted Artelia with the inspection, design of plans and specifications, and supervision of repairs to the metal deck of the Pont Noir in Gatineau. This one-way bridge, reserved for STO buses, provides an essential link between the Gatineau and Hull areas, particularly during spring floods.

Built in 1877, the Pont Noir is a 254-meter-long former railway bridge that was once the only direct rail link between Hull and Montreal. It was redeveloped in 2012 as part of the Rapibus corridor project in Gatineau. Today, nearly 300 buses travel across it daily, mainly during rush hour. The Pont Noir also includes a bicycle and pedestrian path.

Bus traffic combined with wear and tear over time affects the deck surface, which consists of grating fixed to wooden ties with steel plates and lag screws. Artelia has therefore been commissioned to support the STO over a three-year period to maintain proactive monitoring of the structure’s condition, ensure the quality and durability of repairs, anticipate and manage unforeseen events and facilitate coordination between the various stakeholders.

 A strategic bridge in emergency situations

During the major floods of 2017 and 2019, the Pont Noir was an essential link in maintaining the continuity of public and active transportation, while allowing first responders to quickly cross the Gatineau River to respond to disaster areas. This infrastructure is not just a simple link between two areas: it is a strategic artery for mobility and public safety. In a context where climate change is increasing the risk of spring flooding and extreme weather events, its reliability is becoming even more critical.

 We are pleased to see our new Gatineau team contributing to this project, which, in addition to enhancing user safety, helps preserve historical heritage and support the resilience of the region’s public transit network.

14 November 2025
SHARE
News

Find out more

UV Disinfection of Wastewater in Granby
2 June 2026
Our Water Treatment team will oversee the design of this project in collaboration with our Building and Urban Infrastructure teams.
The City of Québec has commissioned our teams to design and oversee the construction of this strategic infrastructure project.
26 May 2026
The City of Quebec has commissioned our teams to design and oversee the construction of this strategic infrastructure.
In just one hour, thanks to their strong team spirit, our colleagues prepared more than 350 bags of soup.
20 May 2026
In just one hour, thanks to their efficiency and strong team spirit, our colleagues prepared over 350 bags of soup.
Le journal Les Affaires a publié un article fort intéressant mettant de l’avant l’innovation de nos experts.
15 May 2026
The newspaper Les Affaires published a very interesting article highlighting the innovative work of our experts.