Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Safety assessment of Paton and Memphrémagog dams

Our team was commissioned to carry out detailed inspections and assess the design, stability and behavior of the dams.
Safety assessment of Foster Dam in Brome Lake

The purpose of the assessment was to verify the condition of the structure, its stability and functionality, and the conformity of its design and construction.
Victoriaville Wetland Management Plan
Shawinigan Ecocentre
Drone surveys for materials management at Carrière St-Dominique

We carried out photogrammetric surveys using a drone, generated precise 3D models, and calculated the quantities of materials.
Beauharnois wastewater treatment plant
Development of Plage de l’Est

It’s a testament to universal accessibility, sustainable development, and the privileged connection between visitors and the river.
Deconstruction of the Champlain Bridge

As the managing consortium, we ensured that the contractor put in place a rigorous system aiming to achieve high environmental standards.
New drinking water supply system in Saint-Adolphe-d’Howard