Restoration of the Rock-Forest dam spillway

This complex project required rigorous water management to ensure the safety and sustainability of the infrastructure.
Rehabilitation of the Weedon power station – Hydro-Sherbrooke

This modernization is part of a process aimed at reinforcing its reliability and compliance with environmental and safety standards.
Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Safety assessment of Paton and Memphrémagog dams

Our team was commissioned to carry out detailed inspections and assess the design, stability and behavior of the dams.
Safety assessment of Foster Dam in Brome Lake

The purpose of the assessment was to verify the condition of the structure, its stability and functionality, and the conformity of its design and construction.
Restoration of the Meder marsh

This Coaticook wetland was to be restored to preserve its biodiversity and contribute to global climate regulation.
Reconstruction of the Île-aux-Tourtes bridge

As an independent certifier, we guarantee project conformity during the design and construction phase.
Reconstruction of the Île-d’Orléans bridge

A design-build project that combines technical innovation and respect for the environment for the Île-d’Orléans bridge.
Route 138 extension – Lower North Shore

Artelia, in collaboration with its partners, was commissioned to design the section between La Tabatière and Tête-à-la-Baleine.
Beauharnois wastewater treatment plant