Modernization of the Mont-Tremblant drinking water production plant

Artelia was commissioned to help the city update its drinking water treatment system.
Restoration of the Rock-Forest dam spillway

This complex project required rigorous water management to ensure the safety and sustainability of the infrastructure.
Rehabilitation of the Weedon power station – Hydro-Sherbrooke

This modernization is part of a process aimed at reinforcing its reliability and compliance with environmental and safety standards.
Reconstruction of Blackwood Dam in Brome Lake

The aim of the project was to restore and reinforce the existing dam, enabling the pond to return to its normal operating level.
Safety assessment of Paton and Memphrémagog dams

Our team was commissioned to carry out detailed inspections and assess the design, stability and behavior of the dams.
Safety assessment of Foster Dam in Brome Lake

The purpose of the assessment was to verify the condition of the structure, its stability and functionality, and the conformity of its design and construction.
Victoriaville Wetland Management Plan

Shawinigan Ecocentre

Drone surveys for materials management at Carrière St-Dominique

We carried out photogrammetric surveys using a drone, generated precise 3D models, and calculated the quantities of materials.
Beauharnois wastewater treatment plant
