8 August 2025

Artelia wins key contract to inspect Rio Tinto IOC’s Dock No. 1 in Sept-Îles

News I
Artelia wins key contract to inspect Rio Tinto IOC’s Dock No. 1 in Sept-Îles
Share
Notre approche repose sur l’efficacité, la rigueur et la complémentarité entre notre organisation et nos partenaires.
©Le Soleil

Our colleagues in Sept-Îles have been commissioned to carry out inspections, surveys, and preparatory engineering work for the 2026 project on Dock No. 1 at Rio Tinto IOC (Iron Ore Company of Canada) with a view to ensuring the long-term viability of this important infrastructure for the next five years. Built in 1952, inspections of the dock could reveal major deficiencies. A detailed procedure for future inspections and maintenance work will therefore be put in place to ensure the long-term proper functioning of the structure.

For Artelia, this project is a strategic opportunity to demonstrate our ability to define and implement a detailed procedure that will ensure consistency in data collection methods and comply with the highest technical standards in the industry. Our port expertise is widely recognized on the North Shore, where we have contributed to the majority of maritime projects carried out in recent years. As part of this project, the seaward side, the embankment, and the anchors will be inspected, and data processing will be carried out by our team.

A team with strong roots on the North Shore

Our approach is based on efficiency, rigor, and complementarity between our organization and our partners. The majority of the project team, including our subcontractors, is based in Sept-Îles, which ensures in-depth knowledge of the environment, appropriate logistics, and high responsiveness in the field. Some of these partners are from the region’s native communities, with whom we ensure respectful and sustainable collaboration.

Since obtaining our preferred contractor status with Rio Tinto IOC a few months ago, we are delighted to see new contracts gradually coming in. Now we have to deliver—and we are ready to do so for this important client!

8 August 2025
SHARE
News

Find out more

Ce projet s’inscrit dans une vision moderne et durable qui favorise la mobilité collective et l’intégration harmonieuse des infrastructures.
16 December 2025
This project is part of a modern and sustainable vision that promotes collective mobility and the harmonious integration of infrastructure.
Nos collègues ont organisé des collectes de denrées et de fonds pour venir en aide aux familles dans le besoin.
15 December 2025
Our colleagues organized food and fund drives to help families in need.
L'établissement intégrera des espaces dédiés à la santé, à l’éducation et à la réinsertion, selon les meilleures pratiques internationales.
28 November 2025
Beyond construction, the new facility will include spaces dedicated to healthcare, education, and reintegration, in line with best international practices.